Well-connected Convenient Efficient
The West Coast Expressway is a privatization project approved by the Government to West Coast Expressway Sdn Bhd (WCE). The project, operates on a build-transfer-transfer model. The project is expected to be completed in five years’ time.
The West Coast Expressway (E32) commences at a junction with Selangor State Road FT31 which runs from Banting, Selangor and ends at the ramp of Changkat Jering toll plaza of the North-South Expressway at Taiping, Perak.
It is planned and designed in such a way so that it is well-connected to the existing highways (such as PLUS, SKVE, NKVE, NNKSB, LATAR, KESAS, etc.), in order to maximize its coverage and gives the road users more options while travelling.
The entire expressway with 21 interchanges will provide convenience to users to plan and travel more efficiently.
11KM
7.2KM
10.1KM
4.5KM
9.7KM
21.8KM
29.5KM
19.1KM
28KM
16.6KM
35.5KM
Variable Message Sign (VMS) and Vehicle Incident Detection System (VIDS) to help traffic management.
Motorcycle shelters.
Touch n Go self -service kiosks at selected locations along the highway.
Emergency telephones on both sides of the highway set at every 2KM interval.
Twenty (20) Interchange.
To be provided with Twelve (12) Rest and Relax areas complete with restaurants, petrol stations, surau and convenience stores
Lay-by at each toll plaza
CCTV surveillance along the highway.
24/7 Hotline @ 1700 81 6600
Fully Electronic Toll Collection (ETC) via Touch ‘n Go, SmartTag and RFID lanes at our closed system toll plazas
Real -time Traffic Control Center (TMC) to monitor the latest traffic conditions for surveillance and emergency purposes.
24 hours surveillance and emergency assistance highway patrol.
HELP US
SERVE YOU
BETTER
Help Us Serve You Better by providing your feedback. Your insights are valuable to us, and we appreciate your input in enhancing our services and overall experience. Together, we can strive for excellence.